What to call a bounded period of work - and whether to have one

Decided: sprint, as docs/sprints/<team>/<slug>.md - a container with its own goal and an agreed end date, several active in parallel, one per team. An intent moved into a sprint leaves the backlog pool and cannot sit in two sprints at once. The artifact was settled in ADR-028; the name in ADR-041.

This entry has already been overturned once, which is the point of it. The first answer was cycle, chosen against sprint on the argument recorded below: borrowing the word borrows the ceremony. It lost to use. Readers stopped at the unfamiliar word and spent their first question asking whether it was a sprint - and the dashboard made the cost visible, since a page built for people who never open the repository had a tab whose label needed a sentence before anything under it could be read. A design argument lost to an observation, which is the only way it should have lost.

The path was the other way round first. docs/teams/<team>/sprints/ reads more naturally if you think team-first, and it lost on one argument: every other folder under docs/ is named for the kind of thing inside it - runbooks/, journeys/, ideas/, research/, discovery/. teams/ would be the first that names an organizational unit instead, and it would immediately invite everything else a team has to live under it. The artifact kind stays the folder; the team is a partition inside it. Worth overturning if a second team turns out to need genuinely per-team configuration rather than just its own files.

The doubt that remains: the borrowed word arrives carrying expectations the standard does not meet. Somebody who knows Scrum will look for points, a velocity commitment and a fixed timebox, and find none of them. That cost is real; it is paid once per reader, in one clause, where cycle charged every reader the same question forever.

Why not the obvious ones

  • cycle was the pick until 2026-08-07: Linear uses it for almost exactly this, so it was expected to arrive pre-explained to both people and agents, carrying recurrence without implying ceremony. In use it did not - it read as a new word for a thing people already had a word for.
  • wave is already spoken for: brownfield alignment runs in waves, and a repo where the same word means two different bounded things is exactly the collision this project keeps finding in its own files.
  • track carries the parallelism well - several teams, several lanes - and loses the time bound and the goal, which are the two things that make the container useful.
  • iteration is accurate and neutral, and as unfamiliar as cycle was without even Linear's precedent behind it - the same tax for less.

What a better answer would have to do

Name a period that (1) has an owner and a goal, (2) has an end date that is agreed rather than fixed by a framework, (3) can run in parallel with several others under one backlog, and (4) does not smuggle in a methodology. sprint fails (4) on its face and is kept anyway, because ADR-041 denies the methodology explicitly and in one place, and because the word is understood before the sentence explaining it. A candidate that does all four and is recognised on sight would win.

The question underneath the name

Whether the standard should carry work periods at all. The counter-argument is honest: the backlog with a definition of done per item already keeps knowledge alive, and periods are coordination, which is scale-profile territory. It landed as scale-only - a solo repo never meets it.

The argument for is timeline: with periods that carry goals and dates, a skill can read every team's folder and derive when the project actually lands, and a closing skill can record what was finished against what was planned. That turns estimation into arithmetic over the repo's own history rather than a meeting. Without periods there is nothing to derive it from.

Options weighed

sprint (rejected once for ceremony, chosen 2026-08-07 for recognition, with the ceremony denied in the record), cycle (chosen 2026-08-02, overturned by use), wave (collides with the alignment waves), track (loses the time bound), milestone (GitHub already owns the term, and it implies a fixed date rather than an agreed one), iteration (unfamiliar without a precedent to lean on).